(TheNewswire)

Windfall Geotek Inc.

DOES NOT CONSTITUTE AN OFFER OF THE SECURITIES DESCRIBED HEREIN

Highlights:

 
  • New high priority targets identified outside of known mineralization near the former Scadding Gold Mine 

  • Windfall Geotek’s AI targets will help accelerate MacDonald Mines exploration programs 

  • The SPJ Project comprises 19,380 hectares in the Davis, Street and Scadding Townships, 40 kilometres East of Sudbury, Ontario and close to key infrastructure (rail, road, power, qualified workforce) and in a mining friendly jurisdiction. 

  • The SPJ project is unique due to it’s high grades potential to be a large scale IOCG System. 

 

Brossard, Quebec - TheNewswire - December 16th, 2021 – Windfall Geotek Inc. (TSXV:WIN) (OTC:WINKF) (FSE:L7C2) a leader in the use of Artificial Intelligence (AI) with advanced knowledge-extraction techniques since 2005 in the mining sector and is pleased to announce it has provided and completed it’s AI Mineral Exploration targeting services for MacDonald Mines Exploration Ltd (TSX-V:BMK) for it’s SPJ Gold Project located North East of Sudbury, Ontario.

 

Windfall Geotek generated 18 new high priority AI targets for further exploration work to assist MacDonald Mines future exploration programs. The AI analysis showed significant upside potential with high probability AI targets outside of the already known high grade gold areas in & around the Scadding mine.

Project Highlights

  • 18 priority AI targets identified (Figure 1,2,3,4) 

  • The work comprised of more than 1 million data points in a surface area of 264.7km2  

  • Windfall Geotek was able to locate old historical showings in which data points were not available showing significant accuracy and significance of drill targets. 

Geological Context

The McDonald Mines’s SPJ Project is a gold-rich iron-oxide-copper-gold (IOCG) property located 20 km northeast of Sudbury, Ontario, Canada.

Regionally, the SPJ Project is located within the Paleoproterozoic Huronian Supergroup of the Southern Province, which consists of a series of steeply dipping metasedimentary rocks with subordinate metavolcanic rocks. Intrusive rocks in the region include the Cutler, Killarney, and Chief Lake granitic intrusions, while the mafic intrusions include the Nipissing diabase suite, the East Bull Lake intrusion-type and the Sudbury Igneous Complex.

Primary Target Model List

Nr

Gold_Target_ID

X_Center Nad83_UTM_17N

Y_Center Nad83_UTM_17N

Area (sq-km)

Perimeter (km)

NTS Sheet

Geol_OGS

1

PT1

527224

5167430

0.036

0.76

41I10

Quartz-feldspar sandstone, argillite and conglomerate

2

PT2

530309

5170690

0.020

0.57

41I10

Conglomerate, sandstone, siltstone, argillite

3

PT3

527736

5171690

0.029

0.69

41I10

Quartz-feldspar sandstone, argillite and conglomerate

4

PT4

527899

5171640

0.032

0.80

41I10

Quartz-feldspar sandstone, argillite and conglomerate

5

PT5

536210

5168600

0.049

0.89

41I10

Conglomerate, sandstone, siltstone, argillite; Mafic and related intrusive rocks and mafic dikes

6

PT6

536490

5168310

0.019

0.55

41I10

Mafic and related intrusive rocks and mafic dikes

7

PT7

538821

5167430

0.029

0.71

41I09

Mafic and related intrusive rocks and mafic dikes

8

PT8

535998

5167670

0.009

0.38

41I10

Conglomerate, sandstone, siltstone, argillite

9

PT9

535588

5166190

0.009

0.40

41I10

Conglomerate, sandstone, siltstone, argillite

Secondary Target Model List

Nr

Gold_Target_ID

X_Center Nad83_UTM_17N

Y_Center Nad83_UTM_17N

Area (sq-km)

Perimeter (km)

NTS Sheet

Geol_OGS

1

ST1

534882

5166700

0.015

0.50

41I10

Conglomerate, sandstone, siltstone, argillite

2

ST2

536790

5165990

0.035

0.77

41I10

Conglomerate, sandstone, siltstone, argillite

3

ST3

537669

5166870

0.033

0.74

41I10

Conglomerate, sandstone, siltstone, argillite

4

ST4

537428

5170620

0.048

0.91

41I10

Conglomerate, sandstone, siltstone, argillite

5

ST5

538778

5171410

0.013

0.47

41I09

Conglomerate, sandstone, siltstone, argillite

6

ST6

538881

5171500

0.004

0.25

41I09

Conglomerate, sandstone, siltstone, argillite

7

ST7

539010

5172200

0.008

0.36

41I09

Conglomerate, sandstone, siltstone, argillite

8

ST8

539221

5170690

0.020

0.61

41I09

Conglomerate, sandstone, siltstone, argillite

9

ST9

539079

5168550

0.012

0.45

41I09

Conglomerate, sandstone, siltstone, argillite

 


Click Image To View Full Size

 

Figure 1: Primary Model - Western Portion of SPJ Project

 


Click Image To View Full Size

 

Figure 2: Secondary Model - Western Portion of SPJ Project

 


Click Image To View Full Size

 

Figure 3: Primary Model - Eastern Portion of SPJ Project


Click Image To View Full Size

 

Figure 4: Secondary Model - Eastern Portion of SPJ Project

 


Click Image To View Full Size

 

Figure 5: MacDonald Mines Property Wide Map of AI Targets produced by Windfall Geotek Inc.

 

The scientific and technical data contained in this press release was reviewed and prepared under the supervision of Grigor Heba, Ph.D., P.Geo., Principal Geologist and a Qualified Person as defined by National Instrument 43-101.

About Windfall Geotek
Powered by Artificial Intelligence (AI) since 2005

Windfall is an Artificial Intelligence company that has been in business for over 15 years developing its proprietary CARDS analysis (AI) and data mining techniques. Windfall Geotek can count on a multidisciplinary team that includes professionals in geophysics, geology, Artificial Intelligence, and mathematics. It combines available public and private datasets including geophysical, drill hole and surface data. The algorithms designed and employed by Windfall are calculated to highlight areas of interest that have the potential to be geologically similar to other gold deposits and mineralization. The Company's objective is to develop a new royalty stream by significantly enhancing and participating in the exploration success rate of mining and to continue the Land Mine detection application as a high priority. Windfall has played a part in numerous past discoveries utilizing its methodology as described at: https://windfallgeotek.com/.

For further information, please contact:for

President and CTO of Windfall Geotek

Email: simran@windfallgeotek.com

Website: www.windfallgeotek.com
Phone: 1-855-946-5145

Additional information about the Company is available under Windfall Geotek’s profile on SEDAR at www.sedar.com. Neither the TSX Venture Exchange nor does its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.

 

FORWARD-LOOKING STATEMENTS: This news release contains forward-looking statements, which relate to future events or future performance and reflect management’s current expectations and assumptions. Such forward-looking statements reflect management’s current beliefs and are based on assumptions made by and using information currently available to the Company. Investors are cautioned that these forward-looking statements are neither promises nor guarantees, and they are subject to risks and uncertainties that may cause future results to differ materially from those expected. These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances. All forward-looking statements made in this press release are qualified by these cautionary statements and by those made in our filings with SEDAR in Canada (available at WWW.SEDAR.COM).

Copyright (c) 2021 TheNewswire - All rights reserved.